top of page

SOLUTIONS FOR WATER
AND ENERGY THOUGHT OUT
FOR THE ENVIRONMENT

ABOUT US

Pleno Ambiente was created in 2012 and its main area of activity is the supply and installation of equipment and materials for the construction and hydraulic infrastructure sector, with a particular presence in Francophone and Lusophone African countries. Headquartered in Vila Nova de Gaia, Portugal, we also have a branch in Senegal and São Tomé and Príncipe ( plenoambiente.sn ), countries where we represent several national brands.

 

We strongly believe in the quality of the products we sell and the services we provide.

 

Since 2023, Pleno Ambiente has been actively involved in the mining sector in Senegal and Mali, with significant supplies for the mining industry, particularly for water drainage.

 

We already have projects completed in 5 countries: Senegal, Mali, Mozambique, São Tomé and Príncipe, Cape Verde and Zambia.

Início: Sobre
IMG_0945.JPG

PUMPING AND ELEVATOR STATIONS

Water Disinfection

WATER AND WASTEWATER TREATMENT PLANTS

IMG_0884.JPG

WATER COLLECTION, CONVEYANCE AND FILTRATION SYSTEMS

Energia_Fotovoltaica.jpg

PHOTOVOLTAIC ENERGY PRODUCTION

AUTOMATION AND ELECTRICAL PANELS

P1190490.JPG

IRRIGATION BLOCKS

100_2135-1272x716.jpg

HYDRAULIC CONTROL EQUIPMENT AND INSTRUMENTATION

Picture3.jpg

WELDING AND HDPE CERTIFICATION SERVICES

ELECTROMECHANICAL ASSEMBLIES

Início: Serviços

PROJECT GALLERY

Project for floodgates in Senegal.

2015

Supply and installation of pumping stations in Senegal.

2021

Gandiaye pumping station, Kaolack, Senegal.

2024

Installation of pumps, hydraulic circuits, and electrical panels.

2025

PORTUGAL

Via Jean Piaget, 356
4410-247 Vila Nova de Gaia

+351 223 238 189

SENEGAL

Mermoz Cité SIPRES between Coté OUEST

DAKAR

SAO TOME AND PRINCE

Terrace of the Fifth of August

BUDO BUDO

dinis.jesus@plenoambiente.com

+239 990 62 82

Início: Entre em contato
North-2020-.png

Co-financed by:

bottom of page