Included in the rehabilitation of the Presidential Palace of Koulouba in Bamako we have installed a compact WWTP which enabled a tertiary level treatment with the reuse of the treated water for the irrigation of the south garden of the palace and the installation of a wastewater lifting station on the edge of the palace building.